After a dry and hot summer this year, the Office of the State Engineer is preparing to pump water from wellfields in the Pecos Basin to meet the state’s water obligations to Texas in 2021. De…
After a dry and hot summer this year, the Office of the State Engineer is preparing to pump water from wellfields in the Pecos Basin to meet the state’s water obligations to Texas in 2021. De…